On page 29 it looks like the picture for "None" represents a structure that is just covered with soil/fill/dirt on top of it. We had a similar scenario in the picture below. Only earthen material is used to keep the below culverts in place. So this would be "None" not "Other"?
top of page
bottom of page
I would call this 'None' - it isn't structured enough , to me, to be considered a headwall, and appears to be more like normal road fill.
Tom